Banner
News

Multiphase expansion for Champagne Metals

September 2011 - Champagne Metals and Processing, Glenpool, Okla., announced the opening of a processing branch in northern Indiana, which will be completed in a three-phase process. The first phase has been completed with the installation of a 0.125 inch by 72 inch Iowa Precision Slear-2 and a roll former for producing sheets with an Imperial Crimp in Topeka, Ind. The second phase will be to relocate to the Elkhart area from the Topeka location. The third stage will be the installation of a Herr-Voss 0.313 inch by 84 inch cut-to-length line.

MM RAS 17 FAQ 330x100

LATEST ISSUE 
MM Cover0917 digital

vert-current-linewhiteSeptember 2017

ON A JOURNEY

Additive manufacturing allows a Tier 1 supplier the freedom to redesign 'the whole system.'

> READ THIS
MONTH'S ISSUE

Instagram - @ModernMetalsMag

Modern Metals on Twitter

Banner

TrendPublishing 6 16 mm

Instagram Icon Large twitter facebook linkedin rss

MM Cover0917 preview FFJ Cover0917 preview mm 0917 brandingcovers2 3 2 Consumables 0917